20,6 km

Length of tracks

Heat production, transmission and distribution

35,18 MW

Installed heat capacity

60 000

MWh/year

Amount of thermal energy made

Heating news

19.01.2022

PUC approved a new Ltd. “Salaspils Siltums” tariff – 61,03 EUR / MWh

News

13.01.2022

The success story of the National Botanic garden

Heating news

03.01.2022

With a significant increase in the price of natural gas, there will be changes starting with the bills received in March

20,6 km

Length of tracks

Heat production, transmission and distribution

35,18 MW

Installed heat capacity

60 000

MWh/year

Amount of thermal energy made

48.20 EUR/MWh

current tariff

Tariffs

10 691.62 MWh

last month's total consumption

House consumption

Video gallery

Heating path to your home

[{"src":"https:\/\/www.youtube.com\/embed\/7mmWezyv8Wg","type":"iframe"}]

The first solar energy park in the Baltics has been opened in Salaspils

[{"src":"https:\/\/www.youtube.com\/embed\/_HYXwuAUvSg","type":"iframe"}]

Construction of flue gas condenser in Salaspils

[{"src":"https:\/\/www.youtube.com\/embed\/6EsY4HnPRf0","type":"iframe"}]

Implemented technologies

1720

Solar collectors

3MW

Wood chip boiler with flue gas condenser

8000 m3

accumulation tank

Remote

data reading system

New connection

Contact Us

31a Miera Street, Salaspils, LV-2169

Waze