20,6 km

Length of tracks

Heat production, transmission and distribution

35,18 MW

Installed heat capacity

60 000

MWh/year

Amount of thermal energy made

News

10.07.2020

Salaspils Siltums participates in seminars organized by Keep-Warm

News

07.07.2020

Hydraulic test for heating networks for the third stage completed – starts to restore the hot water supply to the buildings

News

03.07.2020

Hydraulic tests for heating networks in Salaspils on July 6 and July 7

20,6 km

Length of tracks

Heat production, transmission and distribution

35,18 MW

Installed heat capacity

60 000

MWh/year

Amount of thermal energy made

48.20 EUR/MWh

current tariff

Tariffs

10249,98 MWh

last month's total consumption

House consumption

Video gallery

The first solar energy park in the Baltics has been opened in Salaspils

[{"src":"https:\/\/www.youtube.com\/embed\/_HYXwuAUvSg","type":"iframe"}]

Construction of flue gas condenser in Salaspils

[{"src":"https:\/\/www.youtube.com\/embed\/6EsY4HnPRf0","type":"iframe"}]

Salaspils Siltums production

[{"src":"https:\/\/www.youtube.com\/embed\/6Ui097krOFg","type":"iframe"}]

Implemented technologies

1720

Solar collectors

3MW

Wood chip boiler with flue gas condenser

8000 m3

accumulation tank

Remote

data reading system

New connection

Contact Us

31a Miera Street, Salaspils, LV-2169

Waze