Installation of an electrostatic filter at a heat source in Salaspils, Miera Street 31A

Date of realization
29.10.2024
Contract No.
2.2.3.7/1/24/A/007
Source of funding
European Regional Development Fund.
The aim of the project is to equip a 7 MW wood chip boiler with an electrostatic filter to increase the level of purification in flue gases. According to the contract, the total eligible costs of the project are 492,180 euros, the amount of support in the amount of 50% of eligible costs - 246,090 euros. The contractor is the Association of Legal Entities “FILTER L”.
The aim of the project is to equip a 7 MW wood chip boiler with an electrostatic filter to increase the level of purification in flue gases. According to the contract, the total eligible costs of the project are 492,180 euros, the amount of support in the amount of 50% of eligible costs - 246,090 euros. The contractor is the Association of Legal Entities “FILTER L”.