The aim of the project is to build a solar collector system with a thermal energy storage tank and a biomass boiler house with a capacity of 3 MW. The eligible costs of the project are 6,918,200.00 EUR, the planned Cohesion Fund support is 2,732,000.00 EUR. The contractor is SIA "Filter".